Bathroom renovation in Mijas for apartments and second homes
Bathroom renovation specialists in Mijas. We manage the full project across all three zones — Pueblo, Mijas Costa and La Cala. English communication. We work while you're away.
Bathroom renovation in Mijas: what owners across the three zones are asking for
Mijas Costa concentrates holiday rentals and second homes with a high proportion of British and Scandinavian ownership. Most requests are walk-in shower conversions, updated tiling and new fittings — typically in apartments that haven't been renovated since the 1990s. In chalets in Mijas Pueblo and La Cala, the scope tends to be larger, often covering a full bathroom redesign. We adapt the project to the property type and intended use — whether that's a holiday rental in Mijas Costa or a chalet in Mijas Pueblo.
What's included across all three zones
A complete bathroom renovation covers demolition, waterproofing, plumbing, electrical, tiling, flooring, sanitaryware, shower screen or bath, furniture and lighting. All trades are coordinated by our team under a single project lead. For flush walk-in showers, feasibility depends on the floor height available — we confirm this in the site assessment before quoting. For holiday rental apartments in Mijas Costa, we recommend durable, low-maintenance materials that hold up under frequent occupation.
We work while you're away
We coordinate access and carry out the renovation autonomously for non-resident owners across all three zones. Progress updates and photographic documentation on completion — so you can see the result before you return. Our quotation is prepared after a site visit and reflects exactly what's been agreed. No open-ended items, no surprises at handover.
Renovating a bathroom on the Costa del Sol is about far more than swapping tiles: it means solving waterproofing, ventilation and plumbing to withstand coastal humidity and the intensive use typical of holiday homes. At Costa del Sol Reformas we deliver turnkey bathrooms in Marbella, Estepona, Fuengirola and across Málaga province, with our own in-house team and a 5-year guarantee. We install flush, floor-level shower trays, made-to-measure screens, wall-hung sanitaryware and large-format porcelain using brands such as Porcelanosa, Roca, Duravit and Hansgrohe. Every project starts with a real technical survey —not a template— so the result is durable, easy to maintain and adapted to the region's hard water. More than 500 completed bathrooms back our method.
Step-by-step bathroom renovation process
A properly executed bathroom renovation follows an order that cannot be improvised. We begin with controlled demolition of tiling, flooring and sanitaryware, protecting the rest of the home. Next we set out and reroute the plumbing and drainage: new multilayer pipework, independent shut-off valves and waste pipes laid to the correct fall. The critical stage is waterproofing the wet area before any tile goes up. We then lay the porcelain with the right adhesive and levelling system, fit the shower tray, screen and wall-hung sanitaryware on a concealed frame, and finish with taps, lighting, ventilation and sealing. Each phase is checked before moving to the next, preventing costly problems later.
Materials and brands: floor-level trays, large format and taps
The flush, floor-level shower tray is now the standard: mineral-loaded resin or ultra-slim ceramic, with a linear or concealed grille drain and a 1.5-2% fall towards the outlet. For walls and floors we use large-format porcelain (120x120, 120x260 cm), which reduces grout lines and simplifies cleaning; it requires a deformable C2TE-S1 adhesive, back-buttering and levelling clips for a perfectly flat surface. Wall-hung sanitaryware sits on a frame with a concealed cistern (Geberit, Roca) rated well over 400 kg. For taps we recommend Hansgrohe thermostatic mixers with anti-limescale coating, ideal for the Costa del Sol's hard water. Brands like Porcelanosa and Duravit complete a high-end finish.
Waterproofing and ventilation: what you don't see
What makes a bathroom last for decades sits hidden beneath the surface. We apply flexible cement-based waterproofing across the entire shower area and floor, with reinforcing tape at wall-to-floor joints and corners, plus special detailing around drains and pipe penetrations. We respect the curing times (24-48 h) before tiling: skipping them is the most common mistake and the root cause of leaks. Ventilation matters just as much: Spanish building regulations require extraction in internal bathrooms, and on the Costa del Sol high ambient humidity worsens condensation. We fit humidistat-controlled extractors or heat-recovery units that clear the steam, preventing mould, salt deposits and deterioration of grout and joinery.
Timelines, in-house team and 5-year guarantee
A full bathroom is usually completed in 2-3 working weeks, including the curing times for screed and waterproofing, which should never be rushed. We work with our own in-house team —staff plumbers, tilers and electricians— rather than piece-rate subcontractors: this lets us control quality, meet deadlines and stand behind a genuine 5-year guarantee on the workmanship. We manage every project in Spanish, English and German, which is essential for second-home owners following the works remotely. Before handover we run watertightness, drainage and tap-function tests. More than 500 projects and a 4.6-star rating back a method built to last, not just to look good on delivery day.
Renovating in Mijas: local context
Renovating in Mijas is unlike anywhere else on the Costa del Sol, because Mijas is really three places in one. There's the whitewashed mountain village clinging to the Sierra, with its protected pueblo aesthetic; there's Las Lagunas, the busy urban and commercial hub next to Fuengirola; and there's the 12-kilometre coastal strip of Mijas Costa, dotted with urbanisations like Calahonda and Riviera del Sol where close to half the residents are British or Nordic. At Costa del Sol Reformas we've delivered more than 500 projects reading those differences: modernising a 2000s-boom apartment is nothing like restoring a traditional village home. Our own in-house team, a 5-year guarantee and project management in Spanish, English and German keep your renovation moving from the first quote to the final handover.
Where we work: Mijas Pueblo, La Cala de Mijas, Calahonda (Sitio de Calahonda), Riviera del Sol, Las Lagunas, El Coto.
How we work in Mijas
Why Costa del Sol Reformas
Costa del Sol Reformas is a renovation company in Mijas operating since 2010. Own team, fixed price and 5-year written guarantee on all projects.
Frequently asked questions
What does a bathroom renovation in Mijas include?
Demolition, waterproofing, plumbing, electrical, tiling, flooring, sanitaryware, shower screen or bath, furniture, lighting and finishes. The exact scope is confirmed in the site assessment before the written quotation.
Can you install a walk-in shower in a Mijas apartment or chalet?
Yes. Feasibility for a flush walk-in shower depends on the floor height available — we confirm this in the site assessment before quoting.
Do you work in Mijas Costa, Mijas Pueblo and La Cala?
Yes. We work across all three zones of Mijas without any difference in conditions.
How long does a bathroom renovation take in Mijas?
A complete bathroom renovation typically takes 3 to 5 weeks depending on scope and material availability. We confirm the timeline in the written quotation.
Can you manage the project if I'm not in Spain?
Yes. We coordinate access and carry out the renovation autonomously. We send progress updates and photographic documentation on completion.
Have a project in Mijas?
Tell us about your project and we'll prepare a tailored assessment.
